Part Number: 12248
End Feed Fittings Pack - 200 Piece
The End Feed Fittings Pack - 200 Piece is designed for efficient plumbing and heating installations, offering a comprehensive selection of copper fittings. This product is equipped with a variety of fittings that meet the standards of BS EN 1254-4 to ensure reliable connections and durability.
The product features 15 mm straight couplings for seamless connections, providing secure joints in plumbing systems and a 22 mm straight couplings for larger pipe connections. As well as 15 & 22 mm elbows, allowing for directional changes in piping systems. Additionally, the 15 mm tees enable branching in the piping system, accommodating multiple connections.
Constructed from high-quality copper, the End Feed Fittings Pack is built to ensure durability and resistance to corrosion, making it ideal for both hot and cold water applications.
The comprehensive pack ensures that users have the necessary fittings for various plumbing tasks, reducing the need for multiple purchases.
The End Feed Fittings Pack - 200 Piece offers significant bulk buy savings, a complete range of fittings, compliance with BS EN 1254-4 standards, and the convenience of having everything needed for efficient installations, making it ideal for both professional and DIY projects.
PLEASE NOTE: This item will require soldering to connect it
Alternative Options available.
Benefits
- Significant bulk buy savings for cost-effective solutions
- Comprehensive selection includes straight couplings, elbows, and tees
- Compliance with BS EN 1254-4 ensures quality and reliability
- High-quality copper material for durability and corrosion resistance
- Convenient pack contents cater to various plumbing needs
- 15mm and 22mm options for wide application
WEIGHT & SIZE RESTRICTIONS
Some delivery options may not be available
Specification
Standards | BS EN 1254-4 |
Manufactured/Approved To | BS EN 1254-4 |
Connection | Female Copper |
Fitting Type | Fittings Pack |
Material | Copper |
Pack Contents | 50 x 15 mm Straight Coupling (P/N 6768), 25 x 22 mm Straight Coupling (P/N 6769), 75 x 15 mm Elbow (P/N 6798), 25 x 22 mm Elbow (P/N 6799), 25 x 15 mm Tee (P/N 6809). |
Type | Fittings Pack |
Questions
Ask a Question
- Looking for more information?
- Ask a question and our experts will answer it.
Delivery
FREE DELIVERY OVER £50
NEXT DAY TO MAINLAND UK
Most UK deliveries - see below for details
Order by 9pm Monday - Friday for next working day delivery.
Subject to change
Small Parcel | Large Parcel | Pallets < 800 kilos |
Pallets >= 800 kilos |
|
---|---|---|---|---|
UK mainland (except Scottish Highlands and some other areas) |
Next day | Next day | 2 to 3 days | 2 to 3 days |
Scottish Highlands, UK Islands, some other areas |
2 to 3 days | 2 to 3 days | 2 to 3 days | 2 to 3 days |
Northern Ireland | 1 to 2 days | 2 to 3 days | 2 to 3 days | 2 to 3 days |
Channel Islands, Isle of Man and Republic of Ireland | 2 to 3 days | 2 to 3 days | 2 to 3 days | 2 to 3 days |
EU | 2 to 5 days | 2 to 5 days | 2 to 5 days | 2 to 5 days |
Rest of World | Please enquire |
Please enquire |
Please enquire |
Please enquire |
Delivery is FREE for orders with a value of over £50 (excluding VAT) which are despatched by B.E.S.’s usual means in one consignment. Orders of £50 and under (excluding VAT) will incur a delivery charge of £4.95 plus VAT.
We are happy to arrange for delivery of the Goods on your behalf other than by our usual means, however, any additional charges involved will need to be borne by you.
Whilst we make every effort to deliver Goods within the estimated timescales, delays are, however, occasionally inevitable as they may depend, among other things, on availability of the Goods. We shall not be liable for any delay in delivery of the Goods where the delay is beyond our control.
Although any dates quoted for delivery of the Goods are approximate only, the following delivery times are in our experience usual (these estimates exclude Saturdays, Sunday and public holidays):
We always aim to deliver Goods as near to our estimated times as possible and in any event within 30 days of entering into a contract with you. Where we are unable to deliver the Goods within this time, we will inform you of this. You will be free in this case to cancel the contract and we will reimburse you in full as soon as possible and in any event within 30 days of cancellation.
For delivery times to countries outside the UK, please contact us. We regret that there may be countries outside the UK to which we will not deliver Goods.
Please note that delivery may be made in instalments.
Delivery and packaging
Time for delivery is given as accurately at possible but is not guaranteed. The Customer shall have no right to damages or to cancel the order for failure for any cause to meet any delivery time stated nor shall the Customer be entitled to make, or to purport to make, time for delivery of the essence of the contract.
The date of delivery shall in every case be dependant upon prompt receipt of all necessary information final instructions or approvals from the Customer. Any delays or alternations by the Customer in design, specifications or quantities required may result in delay in delivery.
Failure by the Customer to take delivery of or to make payment in respect of any one or more instalments of Goods delivered under this contract shall entitle the Company to treat the whole or part of the contract as repudiated by the Customer.
The Company will endeavour to comply with reasonable requests by the Customer for postponement of delivery but shall be under no obligation to do so. Where delivery is postponed otherwise than due to the default by the Company, the Customer shall pay all costs and expenses, including a reasonable charge for storage and transportation so occasioned and payment for the Goods shall be made in accordance with these Conditions.
Any packaging by the Company, unless otherwise expressly agreed in writing is intended to provide adequate protection in normal conditions of transit of usual duration. Unless otherwise agreed in writing, cases and other packing materials, when charged for, will be credited if returned to the Company's works within 28 days of the date of invoice, carriage paid and in good condition.
The Company will not be liable for unloading the Goods at the designated point of delivery or for placing them in position on site, except by prior agreement in writing.
Where the Company accepts an order for the supply of Goods to be called off by the Customer over a period then unless otherwise agreed by the Company in writing, such call offs must be made so as to complete delivery of all Goods within 12 months from the date of the Customer's order.
The Company shall have the right to make delivery by instalments and in that event each delivery shall stand as a separate contract and failure to make any instalment delivery shall not entitle the Customer to repudiate the whole contract.
Unless otherwise agreed in writing, whether or not the Company shall arrange transport by its own vehicles or otherwise, delivery shall be effected when the Goods leave the premises of the Company or those of the suppliers to the Company where the Goods are despatched direct from such suppliers premises to the Customer.
Any delivery note or notes presented by or on behalf of the Company and/or its carrier must be signed on receipt of the Goods.
If the Customer requires an alteration in the quantity of an order including suspension or reduction of "firm" schedules then all Goods already in progress may be delivered in accordance with the earlier instructions of the Customer and shall be paid for by the Customer.
If and so far as work has been necessarily commenced in advance of "firm" schedules in order to provide in accordance with a normal process time cycle for deliveries indicated by a "tentative schedule" the Customer shall be liable to accept delivery of such Goods at the times and in the quantities so indicated and to pay therefor.
Save in the case of export contract all pallets and stillages used by the Company in the delivery of the Goods shall remain the property of the Company and shall be returned by the Customer to the Company. Section 32(2) of the Sale of Goods Act 1979 shall not apply. The Company shall not be required to give the Customer the notice specified in section 32(3) of that Act.
Specification
Standards | BS EN 1254-4 |
Manufactured/Approved To | BS EN 1254-4 |
Connection | Female Copper |
Fitting Type | Fittings Pack |
Material | Copper |
Pack Contents | 50 x 15 mm Straight Coupling (P/N 6768), 25 x 22 mm Straight Coupling (P/N 6769), 75 x 15 mm Elbow (P/N 6798), 25 x 22 mm Elbow (P/N 6799), 25 x 15 mm Tee (P/N 6809). |
Type | Fittings Pack |
Questions
Delivery
FREE DELIVERY OVER £50
NEXT DAY TO MAINLAND UK
Most UK deliveries - see below for details
Order by 9pm Monday - Friday for next working day delivery.
Subject to change
Small Parcel | Large Parcel | Pallets < 800 kilos |
Pallets >= 800 kilos |
|
---|---|---|---|---|
UK mainland (except Scottish Highlands and some other areas) |
Next day | Next day | 2 to 3 days | 2 to 3 days |
Scottish Highlands, UK Islands, some other areas |
2 to 3 days | 2 to 3 days | 2 to 3 days | 2 to 3 days |
Northern Ireland | 1 to 2 days | 2 to 3 days | 2 to 3 days | 2 to 3 days |
Channel Islands, Isle of Man and Republic of Ireland | 2 to 3 days | 2 to 3 days | 2 to 3 days | 2 to 3 days |
EU | 2 to 5 days | 2 to 5 days | 2 to 5 days | 2 to 5 days |
Rest of World | Please enquire |
Please enquire |
Please enquire |
Please enquire |
Delivery is FREE for orders with a value of over £50 (excluding VAT) which are despatched by B.E.S.’s usual means in one consignment. Orders of £50 and under (excluding VAT) will incur a delivery charge of £4.95 plus VAT.
We are happy to arrange for delivery of the Goods on your behalf other than by our usual means, however, any additional charges involved will need to be borne by you.
Whilst we make every effort to deliver Goods within the estimated timescales, delays are, however, occasionally inevitable as they may depend, among other things, on availability of the Goods. We shall not be liable for any delay in delivery of the Goods where the delay is beyond our control.
Although any dates quoted for delivery of the Goods are approximate only, the following delivery times are in our experience usual (these estimates exclude Saturdays, Sunday and public holidays):
We always aim to deliver Goods as near to our estimated times as possible and in any event within 30 days of entering into a contract with you. Where we are unable to deliver the Goods within this time, we will inform you of this. You will be free in this case to cancel the contract and we will reimburse you in full as soon as possible and in any event within 30 days of cancellation.
For delivery times to countries outside the UK, please contact us. We regret that there may be countries outside the UK to which we will not deliver Goods.
Please note that delivery may be made in instalments.
Delivery and packaging
Time for delivery is given as accurately at possible but is not guaranteed. The Customer shall have no right to damages or to cancel the order for failure for any cause to meet any delivery time stated nor shall the Customer be entitled to make, or to purport to make, time for delivery of the essence of the contract.
The date of delivery shall in every case be dependant upon prompt receipt of all necessary information final instructions or approvals from the Customer. Any delays or alternations by the Customer in design, specifications or quantities required may result in delay in delivery.
Failure by the Customer to take delivery of or to make payment in respect of any one or more instalments of Goods delivered under this contract shall entitle the Company to treat the whole or part of the contract as repudiated by the Customer.
The Company will endeavour to comply with reasonable requests by the Customer for postponement of delivery but shall be under no obligation to do so. Where delivery is postponed otherwise than due to the default by the Company, the Customer shall pay all costs and expenses, including a reasonable charge for storage and transportation so occasioned and payment for the Goods shall be made in accordance with these Conditions.
Any packaging by the Company, unless otherwise expressly agreed in writing is intended to provide adequate protection in normal conditions of transit of usual duration. Unless otherwise agreed in writing, cases and other packing materials, when charged for, will be credited if returned to the Company's works within 28 days of the date of invoice, carriage paid and in good condition.
The Company will not be liable for unloading the Goods at the designated point of delivery or for placing them in position on site, except by prior agreement in writing.
Where the Company accepts an order for the supply of Goods to be called off by the Customer over a period then unless otherwise agreed by the Company in writing, such call offs must be made so as to complete delivery of all Goods within 12 months from the date of the Customer's order.
The Company shall have the right to make delivery by instalments and in that event each delivery shall stand as a separate contract and failure to make any instalment delivery shall not entitle the Customer to repudiate the whole contract.
Unless otherwise agreed in writing, whether or not the Company shall arrange transport by its own vehicles or otherwise, delivery shall be effected when the Goods leave the premises of the Company or those of the suppliers to the Company where the Goods are despatched direct from such suppliers premises to the Customer.
Any delivery note or notes presented by or on behalf of the Company and/or its carrier must be signed on receipt of the Goods.
If the Customer requires an alteration in the quantity of an order including suspension or reduction of "firm" schedules then all Goods already in progress may be delivered in accordance with the earlier instructions of the Customer and shall be paid for by the Customer.
If and so far as work has been necessarily commenced in advance of "firm" schedules in order to provide in accordance with a normal process time cycle for deliveries indicated by a "tentative schedule" the Customer shall be liable to accept delivery of such Goods at the times and in the quantities so indicated and to pay therefor.
Save in the case of export contract all pallets and stillages used by the Company in the delivery of the Goods shall remain the property of the Company and shall be returned by the Customer to the Company. Section 32(2) of the Sale of Goods Act 1979 shall not apply. The Company shall not be required to give the Customer the notice specified in section 32(3) of that Act.
Hello there
You have added
You might also like
Related Products




Part Number :
6886



Part Number :
21514



Part Number :
13928



Part Number :
21385



Part Number :
13780



Part Number :
20247



Part Number :
18525



Part Number :
13471



Part Number :
18498



Part Number :
22116