Free DeliveryFree Delivery
Experience is EverythingExperience is Everything
Excellent
stars
 
Rating 4.71 Reviews 0000

ITRON ACD/G40 Diaphragm Gas Meter

£1,876.69 £1,563.91
£1,876.69 £1,563.91
More product options available

Part Number: 23505

Manufacturer's Part Number: ACD/G40

ITRON ACD/G40 Diaphragm Gas Meter

The ITRON ACD/G40 Diaphragm Gas Meter is a premium solution for precise gas measurement in commercial settings, suitable for both natural gas and LPG applications. Manufactured to ISO 9001 certified standards and adhering to the stringent BS EN 1359 and MID (04/22/EC) compliance, this meter meets rigorous quality checks for added peace of mind.

It operates by measuring gas consumption in cubic meters, providing a clear understanding of usage patterns. With a maximum capacity of 65 m³/h and a secondary capacity of 40 m³/hr at 0.5 mbar pressure loss, this meter accommodates varying gas flow rates with precision.

With a meter connection size of 65 mm (2.1/2") PN10, this diaphragm meter guarantees secure and efficient gas flow management. Despite its robust capabilities, this meter does not include a test point, simplifying its installation and maintenance process.

(Please verify the inlet/outlet dimensions ('A') and connection sizes to ensure compatibility with specific requirements, as they may differ from traditional UK meter dimensions).

Equipped with a Cyble module, the meter offers a convenient pulse output functionality, enhancing data collection and management capabilities. The Cyble module comes with a 5-meter lead, enabling flexible installation options.

Its sturdy steel construction ensures durability, while the mechanical display offers reliable readings without reliance on external power sources.

The ITRON ACD/G40 Diaphragm Gas Meter is suitable for both natural gas and LPG applications, making it versatile for a range of commercial environments. Offering unparalleled accuracy, reliability, and compliance, making it an ideal choice for commercial gas measurement needs.

Compatible Housing Boxes, Fittings & Seals and Fixings available.

Benefits

  • Designed for use with natural gas and LPG
  • Manufactured to ISO 9001 standards
  • Approved to MID (04/22/EC) module B and BS EN 1359
  • Primary capacity of 65 m³/h and a secondary capacity of 40 m³/hr
  • High level of accuracy
  • Maximum operating pressure of 0.5bar
  • 65 mm (2.1/2") PN10 connection size
See More >

Specification

Brand Itron
Approved by MID (04/22/EC) module B & BS EN 1359
Capacity 65 m³/h
Display Mechanical
Material Steel
Max. Operating Pressure 0.5 bar
Meter Connection Size 65 mm (2.1/2") PN10
Meter Type Diaphragm
Secondary Capacity 40 m³/hr at 0.5 mbar pressure loss
Suitable Application Natural Gas & LPG
Test Point No
Type Commercial Meter

Attachments

Questions

Delivery

FREE DELIVERY OVER £50

NEXT DAY TO MAINLAND UK

Most UK deliveries - see below for details

Order by 9pm Monday - Friday for next working day delivery.

Subject to change
  Small Parcel Large Parcel Pallets
< 800 kilos
Pallets
>= 800 kilos
UK mainland
(except Scottish Highlands and some other areas)
Next day Next day 2 to 3 days 2 to 3 days
Scottish Highlands,
UK Islands, some other areas
2 to 3 days 2 to 3 days 2 to 3 days 2 to 3 days
Northern Ireland 1 to 2 days 2 to 3 days 2 to 3 days 2 to 3 days
Channel Islands, Isle of Man and Republic of Ireland 2 to 3 days 2 to 3 days 2 to 3 days 2 to 3 days
EU 2 to 5 days 2 to 5 days 2 to 5 days 2 to 5 days
Rest of World Please
enquire
Please
enquire
Please
enquire
Please
enquire

Delivery is FREE for orders with a value of over £50 (excluding VAT) which are despatched by B.E.S.’s usual means in one consignment. Orders of £50 and under (excluding VAT) will incur a delivery charge of £4.95 plus VAT.

We are happy to arrange for delivery of the Goods on your behalf other than by our usual means, however, any additional charges involved will need to be borne by you.

Whilst we make every effort to deliver Goods within the estimated timescales, delays are, however, occasionally inevitable as they may depend, among other things, on availability of the Goods. We shall not be liable for any delay in delivery of the Goods where the delay is beyond our control.

Although any dates quoted for delivery of the Goods are approximate only, the following delivery times are in our experience usual (these estimates exclude Saturdays, Sunday and public holidays):

We always aim to deliver Goods as near to our estimated times as possible and in any event within 30 days of entering into a contract with you. Where we are unable to deliver the Goods within this time, we will inform you of this. You will be free in this case to cancel the contract and we will reimburse you in full as soon as possible and in any event within 30 days of cancellation.

For delivery times to countries outside the UK, please contact us. We regret that there may be countries outside the UK to which we will not deliver Goods.

Please note that delivery may be made in instalments.

Delivery and packaging

Time for delivery is given as accurately at possible but is not guaranteed. The Customer shall have no right to damages or to cancel the order for failure for any cause to meet any delivery time stated nor shall the Customer be entitled to make, or to purport to make, time for delivery of the essence of the contract.

The date of delivery shall in every case be dependant upon prompt receipt of all necessary information final instructions or approvals from the Customer. Any delays or alternations by the Customer in design, specifications or quantities required may result in delay in delivery.

Failure by the Customer to take delivery of or to make payment in respect of any one or more instalments of Goods delivered under this contract shall entitle the Company to treat the whole or part of the contract as repudiated by the Customer.

The Company will endeavour to comply with reasonable requests by the Customer for postponement of delivery but shall be under no obligation to do so. Where delivery is postponed otherwise than due to the default by the Company, the Customer shall pay all costs and expenses, including a reasonable charge for storage and transportation so occasioned and payment for the Goods shall be made in accordance with these Conditions.

Any packaging by the Company, unless otherwise expressly agreed in writing is intended to provide adequate protection in normal conditions of transit of usual duration. Unless otherwise agreed in writing, cases and other packing materials, when charged for, will be credited if returned to the Company's works within 28 days of the date of invoice, carriage paid and in good condition.

The Company will not be liable for unloading the Goods at the designated point of delivery or for placing them in position on site, except by prior agreement in writing.

Where the Company accepts an order for the supply of Goods to be called off by the Customer over a period then unless otherwise agreed by the Company in writing, such call offs must be made so as to complete delivery of all Goods within 12 months from the date of the Customer's order.

The Company shall have the right to make delivery by instalments and in that event each delivery shall stand as a separate contract and failure to make any instalment delivery shall not entitle the Customer to repudiate the whole contract.

Unless otherwise agreed in writing, whether or not the Company shall arrange transport by its own vehicles or otherwise, delivery shall be effected when the Goods leave the premises of the Company or those of the suppliers to the Company where the Goods are despatched direct from such suppliers premises to the Customer.

Any delivery note or notes presented by or on behalf of the Company and/or its carrier must be signed on receipt of the Goods.

If the Customer requires an alteration in the quantity of an order including suspension or reduction of "firm" schedules then all Goods already in progress may be delivered in accordance with the earlier instructions of the Customer and shall be paid for by the Customer.

If and so far as work has been necessarily commenced in advance of "firm" schedules in order to provide in accordance with a normal process time cycle for deliveries indicated by a "tentative schedule" the Customer shall be liable to accept delivery of such Goods at the times and in the quantities so indicated and to pay therefor.

Save in the case of export contract all pallets and stillages used by the Company in the delivery of the Goods shall remain the property of the Company and shall be returned by the Customer to the Company. Section 32(2) of the Sale of Goods Act 1979 shall not apply. The Company shall not be required to give the Customer the notice specified in section 32(3) of that Act.

Write Your Own Review
You're reviewing:ITRON ACD/G40 Diaphragm Gas Meter