Free DeliveryFree Delivery
Experience is EverythingExperience is Everything
Excellent
stars
 
Rating 4.71 Reviews 0000

Loctite 55 Pipe Sealing Cord - 160m

Was £18.19 £15.16 Now £16.19 £13.49

Save £2.00 £1.67 (11%)

Was £18.19 £15.16 Now £16.19 £13.49

Save £2.00 £1.67 (11%)

More product options available

Part Number: 12555

Loctite 55 Pipe Sealing Cord - 160m

The Loctite 55 Pipe Sealing Cord is an efficient, versatile thread sealant developed to replace traditional sealing methods such as pastes, hemps, and tapes. This cord instantly seals domestic and industrial pipe systems upon assembly, regardless of temperature, ensuring secure connections.

The product is WRAS approved for potable water use up to 85°C, meeting BS 6920 standards, and is safely compatible with drinking and waste water, gas, and compressed air systems.

It can be used confidently with various metals including brass, copper, stainless steel, cast iron, and galvanised parts.

Packaged in a convenient pocket-sized container with a built-in cutter, this sealing cord offers a practical solution for professionals and DIY enthusiasts alike.

This thread sealant cord provides instant sealing during assembly, eliminating the need for traditional sealing pastes and tapes. It is compatible with a wide range of applications, including drinking water systems, waste water, gas, and compressed air.

With WRAS approval for use with potable water up to 85°C, the Loctite 55 cord meets BS 6920 standards, ensuring safety and reliability.

Designed for use with multiple metal types such as brass, copper, and stainless steel, it comes in a handy, pocket-sized container with a built-in cutter for easy use and storage.

The Loctite 55 Pipe Sealing Cord provides a reliable, easy-to-use sealing solution for domestic and industrial pipe systems, suitable for a range of applications and metal types. With instant sealing, WRAS approval, and a compact container, it replaces traditional sealing methods with efficiency and safety.

Alternative Options available.

Benefits

  • Instant sealing upon assembly for quicker application
  • WRAS approved for safe potable water use up to 85°C
  • Versatile across multiple applications (water, gas, compressed air)
  • Compatible with various metals (brass, copper, stainless steel)
  • Compact, pocket-sized container with a built-in cutter for convenience
  • Meets BS 6920 standards for added reassurance
See More >

Specification

Brand Loctite
Approved by WRAS
Standards BS 6920
Colour White
For Use With Domestic And Industrial Pipe Systems During Assembly, Drinking Or Waste Water (Hot Or Cold), Gas, Or Compressed Air, Brass, Copper, Stainless Steel, Cast Iron, Galvanised, Chromed And Nickel Plated Parts
Max. Temperature 85°C
Size 160 m
Type Thread Sealant

Questions

Delivery

FREE DELIVERY OVER £50

NEXT DAY TO MAINLAND UK

Most UK deliveries - see below for details

Order by 9pm Monday - Friday for next working day delivery.

Subject to change
  Small Parcel Large Parcel Pallets
< 800 kilos
Pallets
>= 800 kilos
UK mainland
(except Scottish Highlands and some other areas)
Next day Next day 2 to 3 days 2 to 3 days
Scottish Highlands,
UK Islands, some other areas
2 to 3 days 2 to 3 days 2 to 3 days 2 to 3 days
Northern Ireland 1 to 2 days 2 to 3 days 2 to 3 days 2 to 3 days
Channel Islands, Isle of Man and Republic of Ireland 2 to 3 days 2 to 3 days 2 to 3 days 2 to 3 days
EU 2 to 5 days 2 to 5 days 2 to 5 days 2 to 5 days
Rest of World Please
enquire
Please
enquire
Please
enquire
Please
enquire

Delivery is FREE for orders with a value of over £50 (excluding VAT) which are despatched by B.E.S.’s usual means in one consignment. Orders of £50 and under (excluding VAT) will incur a delivery charge of £4.95 plus VAT.

We are happy to arrange for delivery of the Goods on your behalf other than by our usual means, however, any additional charges involved will need to be borne by you.

Whilst we make every effort to deliver Goods within the estimated timescales, delays are, however, occasionally inevitable as they may depend, among other things, on availability of the Goods. We shall not be liable for any delay in delivery of the Goods where the delay is beyond our control.

Although any dates quoted for delivery of the Goods are approximate only, the following delivery times are in our experience usual (these estimates exclude Saturdays, Sunday and public holidays):

We always aim to deliver Goods as near to our estimated times as possible and in any event within 30 days of entering into a contract with you. Where we are unable to deliver the Goods within this time, we will inform you of this. You will be free in this case to cancel the contract and we will reimburse you in full as soon as possible and in any event within 30 days of cancellation.

For delivery times to countries outside the UK, please contact us. We regret that there may be countries outside the UK to which we will not deliver Goods.

Please note that delivery may be made in instalments.

Delivery and packaging

Time for delivery is given as accurately at possible but is not guaranteed. The Customer shall have no right to damages or to cancel the order for failure for any cause to meet any delivery time stated nor shall the Customer be entitled to make, or to purport to make, time for delivery of the essence of the contract.

The date of delivery shall in every case be dependant upon prompt receipt of all necessary information final instructions or approvals from the Customer. Any delays or alternations by the Customer in design, specifications or quantities required may result in delay in delivery.

Failure by the Customer to take delivery of or to make payment in respect of any one or more instalments of Goods delivered under this contract shall entitle the Company to treat the whole or part of the contract as repudiated by the Customer.

The Company will endeavour to comply with reasonable requests by the Customer for postponement of delivery but shall be under no obligation to do so. Where delivery is postponed otherwise than due to the default by the Company, the Customer shall pay all costs and expenses, including a reasonable charge for storage and transportation so occasioned and payment for the Goods shall be made in accordance with these Conditions.

Any packaging by the Company, unless otherwise expressly agreed in writing is intended to provide adequate protection in normal conditions of transit of usual duration. Unless otherwise agreed in writing, cases and other packing materials, when charged for, will be credited if returned to the Company's works within 28 days of the date of invoice, carriage paid and in good condition.

The Company will not be liable for unloading the Goods at the designated point of delivery or for placing them in position on site, except by prior agreement in writing.

Where the Company accepts an order for the supply of Goods to be called off by the Customer over a period then unless otherwise agreed by the Company in writing, such call offs must be made so as to complete delivery of all Goods within 12 months from the date of the Customer's order.

The Company shall have the right to make delivery by instalments and in that event each delivery shall stand as a separate contract and failure to make any instalment delivery shall not entitle the Customer to repudiate the whole contract.

Unless otherwise agreed in writing, whether or not the Company shall arrange transport by its own vehicles or otherwise, delivery shall be effected when the Goods leave the premises of the Company or those of the suppliers to the Company where the Goods are despatched direct from such suppliers premises to the Customer.

Any delivery note or notes presented by or on behalf of the Company and/or its carrier must be signed on receipt of the Goods.

If the Customer requires an alteration in the quantity of an order including suspension or reduction of "firm" schedules then all Goods already in progress may be delivered in accordance with the earlier instructions of the Customer and shall be paid for by the Customer.

If and so far as work has been necessarily commenced in advance of "firm" schedules in order to provide in accordance with a normal process time cycle for deliveries indicated by a "tentative schedule" the Customer shall be liable to accept delivery of such Goods at the times and in the quantities so indicated and to pay therefor.

Save in the case of export contract all pallets and stillages used by the Company in the delivery of the Goods shall remain the property of the Company and shall be returned by the Customer to the Company. Section 32(2) of the Sale of Goods Act 1979 shall not apply. The Company shall not be required to give the Customer the notice specified in section 32(3) of that Act.

Write Your Own Review
You're reviewing:Loctite 55 Pipe Sealing Cord - 160m
More product options available